DSR PUNE 2012-13 PDF

Price Rs. All rights reserved, No Part of this publication may be reproduced, or transmitted, in any form or by any means, without the prior permission in writing. Bd - A Excavation. Bd - B Pile Foundation. Bd - C Structural Steel Work. Bd - E Plain Cement Concrete.

Author:Tuk Micage
Country:Togo
Language:English (Spanish)
Genre:Love
Published (Last):7 May 2011
Pages:361
PDF File Size:7.24 Mb
ePub File Size:16.79 Mb
ISBN:222-6-53895-519-4
Downloads:80892
Price:Free* [*Free Regsitration Required]
Uploader:Voodoom



Price Rs. All rights reserved, No Part of this publication may be reproduced, or transmitted, in any form or by any means, without the prior permission in writing. Bd - A Excavation. Bd - B Pile Foundation. Bd - C Structural Steel Work. Bd - E Plain Cement Concrete.

Bd - F Reinforced Cement Concrete. Bd - G Brick Masonry. Bd - H Stone Masonry. Bd - I Block Masonry. Bd - J Water Proofing. Bd - K Expansion Joints. Bd - N Wood Finishes. Bd - O Oil Painting. Bd - Q Wood Work. Bd - U Iron Works. Bd - W Miscellaneous. Rd - Road Earth Work. Rd - Road W. Rd - Road Asphalt Surfacing. Rd - Road Painting. Rd - Road Furniture. Rd - Road Miscellaneus Work. Br - Bridge Foundation. Br - Bridge Sub-Structure. Br - Bridge Super-Structure. Departmental Agencies. Private Agencies.

Road Work. Bridge Work. Rates For Transportation. Labour Rates. Material Rates. Annexure A Pipe. Material consumption. Jail Premises. Corporation Areas. Bridge work in costal area,. Tribal Area in Raigad Dist. The increase in rates as above should be applicable only one at a time e.

The above percentage should be applied on the cost of items after deducting the cost of materials as stated below. PWD store. Structural Steel. Prestressed steel Rates for Bitumen. Pack Bit. These rates are inclusive of all taxes. Actual lead. Deptt's circular No. The agency shall bear. In difficult situation where water is not available in reasonable lead or where water charges are essentially required to be paid to local authorities etc.

Cicular No. Whenever the item splitup in component i. Department issued by the Chief Engineer Mech , Nasik. The rates for items pertaining to Parks and Gardens, shall be taken from the C.

If pumping is required additional item for dewatering shall be introduced while framing the estimate, on BHP basis with prior permission of S. The floor is designated by the space contained between the virgin slabs of. The D. The above increase is applicable for items and specification shown below.

Structural Steel Work, Tubular trusses. External Plastering and Pointing. Flooring, Dado, Skirting, Treads except white glazed, ceramic and marble tiles. External Painting. Manglore Tiles roof, ridge, ceilings. Soil, Waste, Vent and Rain water pipes and mild steel tanks. External Guniting. Add 0. Example : For a work to be done on sixth floor the percentage shall be increased as given below.

Percentage by which rates to be increased for sixth floor. Note : The increases in rates as above shall be on DSR item rates only. WORKS For framing the various rates in D. Lift above 1. Lift above 3.

The grade of reinforced cement concrete should be as per Govt. Circular No. In case of buildings IS should be followed. Appropriate grade of concrete is specified for different exposure. Executive Engineer, National Highway Division,. Bd - A : Excavation. Item No. Rate for in Rs. Item code. Excavation for foundation in. Lift upto 1. Filling in plinth and floors with approved excavated materials in 15cm to 20cm layers including watering and compaction etc. Filling in plinth and floors with contractor's murum in 15 cm to 20 cm layers including watering, compaction etc.

Providing soling using 80mm size trap metal in layers of 15 cm each including filling voids with sand, ramming, watering etc. Providing and filling in the foundation with sand of approved quality including watering, compaction etc.

Dewatering the excavated trenches and pools of water in the building area by using pumps and other devices, including disposing of the water to a safe distance as directed.

Bd - B : Pile Foundation. Providing M R. Bd- B-4 Page No. Chipping and dressing of the R. As directed by Engineer-In-Charge. Providing bentonite slurry process for diameter of piles etc. Carrying out load test for 1. Specifications and dismantling the cap etc. Bd - C : Structural Steel Work.

BAQUERO VIGOTSKY Y EL APRENDIZAJE ESCOLAR PDF

D.S.R._-2012-2013finel_pdw

Embed Size px x x x x Government Resolution, Planning Department No. Resolution Planning Department No. Copy attached in Pg. The increase in rates as above should be applicable only one at a time e. Issue rates of Schedule A materials for above notified area shall be increased by respective percentage. For supply items and providing Earth work in embankment of road materials lead is not considered in the rate analysis.

MANGIONE PHYSICAL DIAGNOSIS SECRETS PDF

Mjp Mechanical Dsr 2012-13

.

IC 74LS00 DATASHEET PDF

.

DRCLARK NET INFO FREQUENCYTABLE PDF

.

Related Articles